Campy Repair – All fabrication Complete

image

image

image

image

image

image

Finished up all the fabrication repair. Brazed the crack in the joint near clamp and brazed the hinge back on the clamp. Also got the adjustable clamp locking mechanism freed up.
Next step is to prep for paint and bring back to showroom standards.

Joe Bringhelli Main Tube Miter Jig

image

image

image

After making a few modifications to the jig I have it setup on the tilting table.  Did a couple of practice cuts and all went smooth. 

Next up I will work on tube length, alignment and angles.

Tilting Table all Cleaned Up

image

image

It has a lip screwed on to the base I need to remove…frozen/stripped screws.  EZ Out in my future.

Ordered assortment of t-nuts and such so should be able to attach this weekend.  Goal to have Bringhelli jig mount by end of weekend.

Tilting Table with Swivel Base part 2

image

image

image

Could not help myself..did a closer look at the table and took a few more shots.  Can not find a mark on it bit appears to be very well made.

As expected the radii tool from previous post is too big for my lathe…solution…start looking for bigger lathe:)

Angle Table with Swivel Base and Convex Radii Tool

image

image

image

image

A few finds from Dempsey and Co visit this morning.  Needed a tilting table so that worked out well. Convex radii tool was a bonus althought not sure fits the lathe yet.  Will try that out later.

Tilting table is a nice 12×8 with what looks like a swivel base.  Will clean it up and post updates.